Type |
Zoned Earthfill |
Volume |
14,500,000 cubic yards
|
Maximum Height |
391 feet |
Height above Stream Bed |
299 feet |
Maximum Base Width |
1,000 feet |
Crest Length |
3,700 feet
|
Crest Width |
40 feet
|
Crest Elevation |
6,185 feet |
Spillway Type |
Earth and Concrete-lined Channel with Fuse Plug Embankment |
Spillway Crest Length |
35 feet top/24.5 feet bottom |
Spillway Capacity |
5,510 cfs |
Spillway Crest Elevation (fuse plug) |
6,182 feet
363,354 AF (includes dedicated storage space of 49,348 AF) 3,300 acres |
Top of Active Storage Elevation Reservoir Capacity Surface Area |
6,166.4 feet
314,006 AF 3,024 acres |
Bottom of Active Storage Elevation Reservoir Capacity Surface Area |
5,902 feet 3,026 AF 80 acres |
Outlet Works Capacity (max) |
3,800 cfs
|
Outlet Works Capacity (normal) |
2,300 cfs |
Construction Costs |
$114 million for dam
$126 million for highways |
Reconstruction Period |
6/87-4/93 |
Water Course |
Provo River |
Initial Filling |
1993-1996 |